Proposed data-centre operator licence CIL threshold

Proposed data-centre operator licence CIL threshold

Status: provisional

Record details

Value
3
Unit
megawatts critical IT load
Value type
threshold
Population
Proposed data-centre operators requiring a DC licence
Denominator
Critical IT load threshold in the July 2026 draft Bill
Reference period
Draft Bill consultation, July 2026
Retrieved
2026-08-20
Published
2026-07-01
Geography
sg.geo.country.singapore
Notes
The draft would require data-centre operators with CIL of at least 3 MW to apply for a DC licence.

Dates describe this record’s own period and applicability. A verification date does not mean a rule is currently in force.